Bailey’s Project: Day 7 – part 2

Things are heating up!

Brian and Greg are completing final assembly of the sign and working out all of the details of installation.  Wow – what a paint job! Brian has outdone himself on this – amazing! We are ready for install on Sunday. 012

 John is on location with the bucket truck installing the 3″ thick steel sign bracket.007

006