Fetch Sign – Woof 2

Files are ready! – our HDU is on the MultiCam table and we’re ready to cut. We are going to end up with a 3″ sign panel once the two halves are glued together so we’ve planed our 2″ HDU down 1/2″ then cut the face.

We’ll insert out steel tubing, glue the panels together and our panel is done. Now it’s on to “The Bone”.

IMG_3565 IMG_3567

Fetch Sign – Woof 1

It’s an exciting day here at KDF. We were asked by our good friends at Fetch Bar & Grill in Warwick, NY to update their sign based on a new logo that was just refreshed by our favorite designer, Nanette Hoey.

189

After some quick sketches we designed the internal frame that will be made from welded 1″ steel tubing – this will be incredibly strong and make for a very simple installation.

InternalFrame

Our files are created in Enroute Pro and prepped for cutting. We like to have all of the elements assemble in 3D before going to cut to ensure it’s exactly what we want.

New Bone closeup

New Bone Side view

Next step is to start cutting! Stay tuned.